Gravel Process Plant at Denton Wharf — a marine sand and gravel processing project delivered by QPI for J Clubb in Gravesend, UK.
J Clubb
Client
Gravesend, UK
Project location
400 TPH
Maximum feed to plant
230mm
Maximum feed size
Project Overview
Gravel Process Plant at Denton Wharf
QPI were commissioned to supply and install all ancillary parts for J Clubb’s new Marine Sand and Gravel Process Plant at Denton Wharf, Gravesend.
The project included the supply and installation of all conveyor belting, idlers, idler frames and conveyor pulleys, supporting the plant’s wider material handling and processing requirements.
The new plant carries a bulk density of 1.6 tonnes per cubic metre at an angle of repose of 37.5°, with a maximum feed size of 230mm. The system is designed to run at a maximum capacity of 400 TPH feed to plant with the coarsest feed, reducing as necessary for finer feeds to limit feed to the sand plant to less than 210 TPH.
Design service factors were based on 10 hours per day plant operation, ensuring the supplied conveyor components and ancillary parts were aligned with the operational demands of a working marine sand and gravel processing facility.
Scope of Work
Ancillary Supply & Installation
- Supply of conveyor belting
- Installation of conveyor belting
- Supply and fitting of idlers
- Supply of idler frames and pulleys
Engineering Factors
Marine Aggregate Design Data
- Bulk density of 1.6 tonnes/m³
- Angle of repose at 37.5°
- Maximum feed size of 230mm
- Variable feed requirements for finer material
Equipment
Conveyor Components Supplied
- Conveyor belting
- Idlers
- Idler frames
- Conveyor pulleys
Delivery
Denton Wharf Installation
- Installation at Gravesend, UK
- Support for new process plant
- Ancillary conveyor package delivery
- Integration with wider plant requirements
Performance Requirement
400 TPH Maximum Feed
- 400 TPH maximum feed to plant
- Capacity based on coarsest feed
- Feed reduced as required for finer material
- Sand plant feed limited below 210 TPH
Operational Basis
Service Factor Alignment
- Design based on 10 hours per day operation
- Component selection aligned to plant duty
- Support for demanding aggregate processing
- Reliable bulk handling performance
Industry Relationships
Supporting Leading UK Industrial Operations
QPI continues to support a wide range of established operators across quarrying, aggregates, recycling, industrial processing and heavy material handling sectors. These organisations represent valued client relationships developed through ongoing operational support, engineering supply and long-term conveyor system partnership.
QPI continues to support industrial operators nationwide through conveyor systems, belting, maintenance and material handling engineering support. If you're interested in working with QPI, contact our team today.